The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape. The layout is apparent and next up will be the loft level with roofing going on.








Custom Lake Homes
The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape. The layout is apparent and next up will be the loft level with roofing going on.








The spaces we’re creating inside and out of the homes that we are building. I’m showcase a bit of everything from floor to ceiling as well as exterior touches to really make each home unique and inviting. The craftmanship and customer style make each space a new area to explore and take pointers from.












The story of a home continues to unfold: The second story is taking shape. Framing and exterior walls are almost finished. The deck is started and next up the roof will get shingles before we move on to Hardie siding and the interior getting drywalled.








The spaces we’re creating inside and out of the homes that we are building. I’m showcase a bit of everything from floor to ceiling as well as exterior touches to really make each home unique and inviting. The craftmanship and customer style make each space a new area to explore and take pointers from.












This site is really starting to become a home construction area instead of just removing tons of rock and making walls with it. We’ve got the poured walls for the basement up and water proofed. The rough-in plumbing is in place and we’ve back filled up to the poured walls. Next up will be the foundation getting poured and the beginning of framing.








The spaces we’re creating inside and out of the homes that we are building. I’m showcase a bit of everything from floor to ceiling as well as exterior touches to really make each home unique and inviting. The craftmanship and customer style make each space a new area to explore and take pointers from.












We’re adjusting the driveway and parking area by grading more of the area around them and altering the steepness of the land. Foundations have been poured and now the basement is being framed out and septic lines run. It’s really starting to come together.





Prep for the foundation to be poured, you can see the poured walls and mesh grid with the rebar and rough plumbing all set for the concrete.
The septic system is in a three-step configuration to fit the size of the house and the grading of the site.
You get to walk around the site and see how the grading of the driveway and parking are laid out.
The spaces we’re creating inside and out of the homes that we are building. I’m showcase a bit of everything from floor to ceiling as well as exterior touches to really make each home unique and inviting. The craftmanship and customer style make each space a new area to explore and take pointers from.












The poured walls are in place and we’ve got backfill being finished up. The basement is all framed showing the layout. You can see all the walls, doorways and window placement for the basement.








The spaces we’re creating inside and out of the homes that we are building. I’m showcase a bit of everything from floor to ceiling as well as exterior touches to really make each home unique and inviting. The craftmanship and customer style make each space a new area to explore and take pointers from.