Site icon PBC Blog

Rippling Cove-Keowee-20

The home is getting more stone installed on the exterior along with siding. Corbels are getting stained. T&G ceilings are going up as well. This home just continues to add-on the charm.

The home is getting some of the exterior trim installed while we have a break in the rain.
The stone is still being installed all the way around the home.
The guys are staining the corbels before they get installed as part of the exterior trim.
The wooden siding is being installed above the stone.
The entry way is getting a T&G ceiling.
The guys are staining the T&G, it’s going to be lovely.
Another T&G ceiling going up.
The entry is getting the rest of the stone installed.

 

Exit mobile version