Rippling Cove-Keowee-17

The house is getting more stonework on the exterior and the chimney. The steel arches are being raised into place. The beams are being stained and the electrical installed.

The home continues to get more stone installed.
The electrical boxes are going in.
The tub is now being installed.
All the previously installed beams are getting stained before they are wrapped to protect them from the sheet rock that will soon be going in.
The steel arches are being raised into place.
The chimney is receiving its stonework.
The electrical boxes for the exterior are installed as well.
The exterior trim is being delivered.