Site icon PBC Blog

Timberbrook-Keowee-15

The fireplaces are getting stone work installed, the showers are getting tiled and the mantles stained. The exterior is getting corbels and crows feet done in beautiful wood work. This home is getting all the touches that elevate it as a custom craftsman home.

The fireplace is getting stone installed.
This shows the top and sides of the fireplace with stone installed.
Now you can see the detail in the stonework and that it goes all the way to the ceiling.
Beautiful marbled tiles is being installed in the shower.
The accent band is in a herringbone pattern in the shower.
The over hangs have all the corbels installed now.
The crows foot has been completed.
The mantle on the fireplace has been stained and the built-ins painted.
Exit mobile version