Rippling Cove-Keowee-13

We’ve got the garage being framed and tied into the home framing. White oak timbers are being delivered and those will make a huge impact in the design element of this home.

The walls of the garage are being framed and raised into place.
The garage is getting the roof framed and sheeting is being placed on the exterior.
The roof is being framed for the garage.
Timbers being delivered and stacked on the job site.

A walk through showing the framing of the bonus room and loft area.

Shaped white oak timbers to use as beams in the house.
More white oak timbers all ready to be assembled for trusses.
The main level is all framed and the floor system is in place for the loft and bonus room level.