Little Lightwood-Hartwell-4

The story of a home continues to unfold: You can see the poured walls and foundation all set. The rough in plumbing is set in place and all backfilling is just about complete.

Backfill and rough in
Backfill around the basement poured walls.
Backfilling
Backfill surrounding the poured walls for the basement.
Basement from the side
View down into the basement of the poured walls.
Filling in
Large equipment being used to move dirt into place.
Garage slab
Prep for the foundation to be poured.
House slab
Rough in plumbing in the foundation.
Mulch cover
Mulch over the dirt up to the poured walls.
Rough in plumbing in slab
The foundation inside the poured walls.