Rippling Cove-Keowee-4

We’ve got footers and wall forms for the poured concrete walls. The shape of the house is becoming visible and more will be revealed as framing begins next. The foundations are in place now and things will move much quicker for the home to come to fruition.

crane
Crane placing wall forms.
Footers being laid out
Footers laid out and ready to be poured.
Poured walls
Walls forms in place and ready for concrete.
Wall forms in use
Wall forms coming down off the poured walls.
Wall forms
Wall forms being placed.
Walls in place
Poured walls.
Sealant on poured walls
Sealant placed on the poured walls.
lake view over walls
Poured walls all ready for framing to begin.

Tammerick-Hartwell-3

The site is being staged for the foundation, footers and poured walls. You can see the progression as the site is leveled and set up for the wall forms to be placed and filled with concrete.

Footers set
Fotters with rebar to support the poured walls to go up.
Gravel drive w sign
Widening the temperorary driveway.
Level and ready
The site all leved and ready.
Marked foundations
The foundation all marked out.
Staging the poured walls
Staging the forms for the poured walls.
tall rebar in place
Tall rebar in place to add stability and strength to the poured walls.
wall forms in place
Wall forms in place and ready for concrete.
Wall forms ready to use
Wall forms all set to use.

Little Lightwood-Hartwell-3

The story of a home continues to unfold: You can see the foundation all dug out, the footers in place, wall forms going up for the poured walls. Framing will begin once the concrete sets.

 

Delivery of wall forms
The delivery of wall forms to do the poured walls with.
Footer and rebar
Rebar in the footers for stabilizing the poured walls.
footers
Footers laid out.
getting ready for foundation pour
The foundation all dug out and ready for footers.
Poured walls
Concrete in the forms drying.
Septic hole
Digging of the foundation.
Wall forms going up
Walls forms being arranged.
Walls ready to pour
Wall forms up and locked in place for the concrete to be poured into them.

Timberbrook-Keowee-3

This home’s story has hit a slight bump, we found boulders. When digging for the basement and foundation we found tons of rock, many very large. It takes more time to unearth them and haul them away. The following pictures show the sheer size and volume that have been dug up.

Rippling Cove-Keowee-3

We discovered that this site had more large boulders than usual. We’ve dug up more rock than expected so the grading and digging of the basement has taken longer than initially scheduled. We discover as we dig but progress has been made and as you can see in the pictures we’re just about ready for the foundation to be poured. This home will be beautiful once we finish it.

Tammerick-Hartwell-2

The site is being cleared and graded in preparation for building the new home. Here we’re showing the views that will be had from the new home and how a plot of land gets cleared of underbrush and trees so that we can build a home.

Little Lightwood-Hartwell-2

The story of a home continues to unfold: An unveiling of the lot from wild trees and underbrush to a level plain to build upon. Look through the images and see how it begins.

Timberbrook-Keowee-2

The story of a home unfolds a bit more: A beautiful view of the lake, the unveiling of the lot from wild trees and underbrush to a level plain to build on. Look through the pictures and see.

equip in use
Equipment in use to grade the lot
grading
A flat plane being created
gravel and equip
Grading beside the gravel drive
gravel drive
Temporary gravel drive
logs
Logs ready to be removed
sign
Our sign at the front of the lot
trees & equip
Trees with the underbrush removed
view
The lovely view of the lake

Rippling Cove-Keowee-2

The story of a home unfolds a bit more: the beautiful view that’ll be had, the clearing of trees to make room for the house and a temporary driveway for construction vehicles to make use of. Let’s take a look.

pbc sign
Our builder sign next to the temporary water & electricity.
view
The beautiful view of Lake Keowee
survey
Surveying the lot
excavator
Excavating
lot
A view of the lot towards the lake
driveway 2
The gravel driveway continuing towards the lake
driveway
The beginning of the gravel driveway
gravel drive
The gravel driveway in use.

Tammerick-Hartwell-1

Elevation shots for the new project going up on Tammerick on Lake Hartwell. This home has large spaces for a grand impression, spacious but private. The exterior features stone mixed with cedar shake an open deck as well as a screened in porch to enjoy the lake atmosphere.

  • 4330 sqft
  • 4+ Bedrooms
  • 3 Baths
  • 1 Double Sided Fireplace Between the Living and Sun Rooms
  • 441 sqft Workshop
  • 3 Car Garage
  • Stewart Left Front Elevs
    Front & Left Elevations
    Stewart Right Rear Elevs
    Right & Rear Elevations